Home Search MenuNew Sidewalks Project: 19th Avenue NE
NE 196th Street to NE 205th Street
Status
As of November 2024
Phase: Design
KPFF has been selected to begin designing this project and is currently working towards 30% design. We expect to receive 30% design in November. Survey of the project area and arborist review began in June 2024. Construction is expected in mid-2025.
Project Overview
The 19th Avenue NE Sidewalk Project will construct sidewalk on the west side of 19th Avenue NE and sidewalk and curb ramp improvements at the major intersections between NE 196th Street and 244th Street SW (NE 205th Street).
Project location
This project is part of the 2018 voter-approved effort to build and repair sidewalks throughout Shoreline.
Project improvements include:
- Pedestrian facilities with curbs and gutters
- Curb ramps
- Drainage improvements
Project Timeline
- Preliminary Design: Summer/Fall/Winter 2024
- Final Design: Winter 2024
- Construction: Summer 2025
Tree Impacts
We are early in the design process but anticipate that this project may impact up to 10 trees. A full arborist report will be completed and available for review in late 2024.
Public Outreach
We will hold an in-person and online open house for the public to review and comment on the 30% design and arborist report in late 2024.