Welcome to the Hidden Lake Dam Removal
Project Online Open House!

The purpose of this Online Open House is to provide a chance for residents to:

  • Learn more about this project
  • Share what’s important to you and provide comment

Learn more about the proposed design and history of this project below and complete the survey to provide feedback. The online open house and survey will take only a few minutes to complete.

Thank you for your participation!

Project Overview

The City of Shoreline is proposing to remove the existing Hidden Lake Dam in order to improve flood risk and sediment transport conditions for Boeing Creek within the existing lake area. Hidden Lake is an artificially made water body built in 1920 as a private fishing pond. Since that time, the lake has continually dealt with sediment accumulation issues. The initial lake was completely filled in by the 1970’s and has continued to accumulate large volumes of sediment since its latest re-establishment in 1995. The lake can only be maintained through regular removal of these large volumes of sediment (dredging). If the lake is allowed to completely fill itself, it would prevent flows from Boeing Creek to safely pass under NW Innis Arden Way, creating a potentially dangerous flood risk to the roadway and nearby properties. The last time the lake was dredged was in 2013 and shortly after City Council decided to stop dredging and begin this project to remove the dam.Timeline_Hidden_Lake_Dam_Removal_Project

A timeline of Hidden Lake’s history (click the image to enlarge)

The project will include the restoration of Boeing Creek through the existing Hidden Lake area. Removing the lake is expected to improve water quality by reducing the introduction of bacteria from waterfowl and lowering the water temperature. The replacement of the existing stream culverts crossing below NW Innis Arden Way will improve flood control in the area. Additionally, access to the site will be enhanced with the construction of new looped trails within Shoreview Park along the restored creek. ProjectArea_Hidden_Lake_Dam_Removal_Project
The existing project site (click the image to enlarge)

Schedule

Construction of the proposed project improvements require in-water work which can only be completed during the summer months. Therefore, a phased approach to the work must be implemented. The first phase of construction will include the removal of the lake and dam, stream restoration, and trail improvements. The second phase of construction will replace the culverts underneath NW Innis Arden Way.

Schedule_Hidden_Lake_Dam_Removal_Project

A general outline of the project schedule (click the image to enlarge)

Proposed Site Plan

An illustrative perspective of the Hidden Lake area following construction might look like the following graphic, once plants are fully established.

Conceptual_Drawing_Fish_and_Wildlife_HabitatSM
An illustrative drawing of the Hidden Lake area following construction might look like (click the image to enlarge)

The project will re-establish the natural habitat of the Hidden Lake area by removing the artificially made lake, constructing a defined channel of Boeing Creek in its place that contains natural fish and wildlife habitat and grading to create a connected floodplain which will include planting of native wetland and upland riparian vegetation communities. The vegetation communities are shown the in following illustration.

VegetationCommunities_HiddenLake110620SM
Vegetation communities (click the image to enlarge)

The proposed plantings will create a wildlife habitat for numerous species shown illustratively in the following graphic.

Illustrative Plan for Wildlife Habitat
Wildlife habitat created for numerous species (click the image to enlarge)

Take the Survey

We want your feedback. Please complete the survey to provide your comments. Thank you!

Translations 

English  If you would like to communicate with the City of Shoreline or review a document in another language, please send your request along with your contact information to clk@shorelinewa.gov or call 206-801-2700.

Spanish   Si quisiera comunicarse con la ciudad de Shoreline o revisar un documento en otro idioma, envíe su solicitud junto con su información de contacto a clk@shorelinewa.gov o llame al 206-801-2700.

Chinese (Traditional)  如果您想與 City of Shoreline 進行交流或檢視以另一種語言提供的文件,請將您的請求連同您的聯絡資訊發送到 clk@shorelinewa.gov 或請致電 206-801-2700。

Chinese (Simplified)  如果您想与 City of Shoreline 进行交流或查看以另一种语言提供的文档,请将您的请求连同您的联系信息发送到 clk@shorelinewa.gov 或请致电 206-801-2700。

Korean  City of Shoreline에 연락하고 싶거나 다른 언어로 된 문서를 검토하려면 연락처 정보와 함께 요청서를 clk@shorelinewa.gov로 제출하거나 206-801-2700번으로 전화해 주십시오.

Vietnamese  Nếu quý vị muốn liên hệ với Thành phố Shoreline hoặc đọc tài liệu bằng ngôn ngữ khác, vui lòng gửi yêu cầu cùng với thông tin liên hệ tới địa chỉ clk@shorelinewa.gov hoặc gọi 206-801-2700.

Tagalog  Kung gusto mong makipag-usap sa Lungsod ng Shoreline o suriin ang isang dokumento sa ibang wika, pakipadala ang iyong kahilingan kasama ng iyong impormasyon sa pakikipag-ugnayan sa clk@shorelinewa.gov o tumawag sa 206-801-2700.

Amharic  የሾርላይን ከተማ ጋር ለመገናኘት ከፈለጉ ወይም አንድን ሰነድ በሌላ ቋንቋ ለመከለስ ከፈለጉ ጥያቄዎን ከመገኛ መረጃዎ ጋር በማድረግ በ clk@shorelinewa.gov ላይ ኢሜይል ያድርጉ ወይም በ 206-801-2700 ላይ ስልክ ይደውሉ።

Tigrigna  ምስ ከተማ ሾርላይን ክትዘራረቡ ወይ ድማ ሰነዳትኩም ብካልእ ቋንቋ ከተገምግሙ ምስ እትደልዩ፡ ጠለባትኩም ምስናይ ናይ መርከቢ ሓበሬታኹም ናብ clk@shorelinewa.gov ስደዱ ወይ ድማ ብቑጽሪ 206-801-2700 ደዉሉ።

Russian  Если вы хотите связаться с представителями города Шорлайн (Shoreline) или ознакомиться с документом на другом языке, отправьте запрос вместе со своими контактными данными на адрес clk@shorelinewa.gov или позвоните по телефону 206-801-2700.

Japanese  City of Shoreline とのご連絡、または他の言語での資料閲覧をお望みでしたら、お客様のご連絡先を添えたリクエストをclk@shorelinewa.gov まで送信いただくか、 206-801-2700 までお電話をお願いいたします。

Khmer (Cambodian)  ប្រសិនបើលោកអ្នកចង់ប្រាស្រ័យទាក់ទងជាមួយទីក្រុង Shoreline ឬពិនិត្យឯកសារឡើងវិញជាភាសាផ្សេងទៀត សូមផ្ញើសំណើរបស់អ្នកជាមួយព័ត៌មានទាក់ទងរបស់អ្នកទៅ clk@shorelinewa.gov ឬហៅទូរស័ព្ទទៅលេខ 206-801-2700។