Construction: Aurora Corridor N 192nd to N 205th

Print

Construction Update
Updated May 22, 2015 

 

Be Safe!

The east side of Aurora and side streets are live work zones. It is difficult for equipment operators to see pedestrians because of visibility. Pedestrian traffic should avoid walking through areas of active work and equipment and follow the footprints on N 200th or walk through coned pedestrian access routes along the east side of Aurora.
 Footprints_on_N_200th_guiding_pedestrians

 

Roadway Work

Work on the structural sidewalk will continue with pile cap work on the north side of N 200th Street. Curb, gutter, and sidewalk work will continue north along Aurora. Excavation work will occur between N 200th and N 205th Streets.

Utility Work

The joint utility trench excavation and installation will continue on N 199th Street. Street lighting work will be ongoing.

Traffic Revisions:

N 192nd to N 198th Street

The east side of Aurora has limited ingress and egress from just north of the YMCA to N 198th Street for business and local access only. This temporary local access road must be used to reach any business or residence on the east side of Aurora between the YMCA and N 198th Street. Entry into this part of the road is north of the YMCA with one way traffic all the way to the exit at N 198th Street. This roadway configuration (see map below) is scheduled to last several months until work on the east side of Aurora is complete and work shifts to the center of Aurora. The local access will continue to be a live work zone with crews and equipment. Users are urged to proceed with caution through the area.

Temporary_access_changes_map  

 

Aurora and N 200th Street

Transit routes leaving the Aurora Transit Center have changed during construction. Please visit King County Metro and Community Transit for the latest details. King County Metro customer service can be reached at (206) 553-3000 and Community Transit can be reached at (425) 353-RIDE (7433).

 

 

Setting_girders_for_the_structural_sidewalk
Setting girders for the structural sidewalk along Aurora
Girders_set_for_new_structural_sidewalk Grading_the_new_BAT_lane_near_N_200th

Girders set for the new structural sidewalk

Grading for the new BAT (Business Access & Transit) lane near N 200th Street 

 

Links
Aurora N 165th - N 205th Page
Aurora 192 - 205 Design Map
Project fact sheet (Jan 2014)
Frequently Asked Questions
Shoreline Currents
Upcoming City events
Resources for businesses
Slide Shows:

Shop Shoreline Businesses

 

 

 

 

If you wish to receive project updates, please sign up for Alert Shoreline and select "Aurora Updates" as one of your community alert selections.